{"id":5562,"date":"2026-11-16T06:33:15","date_gmt":"2026-11-15T22:33:15","guid":{"rendered":"https:\/\/www.corvelanmag.com\/?p=5562"},"modified":"2026-10-30T13:05:49","modified_gmt":"2026-10-30T05:05:49","slug":"oem-magnetic-separator-specification","status":"publish","type":"post","link":"https:\/\/www.corvelanmag.com\/de\/oem-magnetic-separator-specification\/","title":{"rendered":"Wie OEMs einen Magnetabscheider f\u00fcr eine neue Aufbereitungsanlage spezifizieren sollten"},"content":{"rendered":"\n<style>\n.cv-oem-spec{display:block;float:none;clear:both;columns:auto;color:#27272a;font-family:inherit;font-size:17px;line-height:1.75;overflow-wrap:break-word}\n.cv-oem-spec *{box-sizing:border-box}\n.cv-oem-spec .cv-intro,.cv-oem-spec .cv-section,.cv-oem-spec .cv-toc{display:block;float:none;clear:both;columns:auto;padding:22px;margin:0 0 24px;border:1px solid #d4d4d8;border-radius:16px;background:#fff}\n.cv-oem-spec .cv-intro,.cv-oem-spec .cv-toc,.cv-oem-spec .cv-faq{background:#f5f5f4}\n.cv-oem-spec .cv-section{border-top:4px solid #3f3f46;box-shadow:0 3px 12px rgba(0,0,0,.035);scroll-margin-top:100px}\n.cv-oem-spec h2{font-size:30px;line-height:1.3;margin:0 0 20px;color:#27272a}\n.cv-oem-spec h3{font-size:24px;line-height:1.35;margin:28px 0 12px;color:#27272a;scroll-margin-top:100px}\n.cv-oem-spec p{margin:0 0 17px}\n.cv-oem-spec strong{font-weight:700}\n.cv-oem-spec ul,.cv-oem-spec ol{padding-left:25px;margin:12px 0 20px}\n.cv-oem-spec li{margin:7px 0}\n.cv-oem-spec a{color:#31343a;text-decoration:underline;text-underline-offset:3px}\n.cv-oem-spec a:hover{color:#09090b}\n.cv-oem-spec a:focus-visible,.cv-oem-spec [tabindex]:focus-visible{outline:3px solid #52525b;outline-offset:4px}\n.cv-oem-spec .cv-toc ul{margin:8px 0 0}\n.cv-oem-spec .cv-media{display:block;float:none;clear:both;margin:20px 0}\n.cv-oem-spec .cv-media img{display:block;float:none;max-width:100%;height:auto;margin-inline:auto}\n.cv-oem-spec .cv-table-scroll{display:block;overflow-x:auto;margin:20px 0;border:1px solid #d4d4d8;border-radius:8px}\n.cv-oem-spec table{width:100%;min-width:640px;border-collapse:collapse;font-size:16px;line-height:1.65}\n.cv-oem-spec th,.cv-oem-spec td{padding:12px 14px;text-align:left;vertical-align:top;border-bottom:1px solid #d4d4d8}\n.cv-oem-spec th{background:#e7e5e4;color:#27272a;font-weight:700}\n.cv-oem-spec tbody tr:nth-child(even){background:#fafaf9}\n.cv-oem-spec .cv-faq h3{padding-top:18px;border-top:1px solid #d4d4d8}\n.cv-oem-spec .cv-section>:last-child,.cv-oem-spec .cv-intro>:last-child{margin-bottom:0}\n@media(max-width:768px){\n .cv-oem-spec{font-size:16px}\n .cv-oem-spec .cv-intro,.cv-oem-spec .cv-section,.cv-oem-spec .cv-toc{padding:18px;margin-bottom:18px;border-radius:12px}\n .cv-oem-spec .cv-section{border-top-width:3px}\n .cv-oem-spec h2{font-size:24px}\n .cv-oem-spec h3{font-size:20px}\n .cv-oem-spec th,.cv-oem-spec td{padding:10px 12px}\n}\n<\/style>\n<div class=\"cv-oem-spec\">\n<div class=\"cv-intro\"><p><strong>An OEM magnetic separator specification should define the required separation result, the material entering the machine, its operating range, the physical and control connections, and the acceptance tests.<\/strong> Write these requirements before choosing a model. A supplier can then size the separator for the same conditions that the new processing line must handle.<\/p>\n<p>For a line builder, the difficult part is often the connection between machines. The magnet may fit, yet the feeder creates a deep surge. The detector may alarm, yet the belt carries the metal into the crusher before stopping. A useful specification explains how the complete arrangement will work, including who supplies and tests each connection.<\/p>\n<\/div>\n<nav aria-label=\"On this page\" class=\"cv-toc\"><p><strong>On this page<\/strong><\/p><ul><li><a href=\"#specification-basics\">What should an OEM specify before asking for a model?<\/a><\/li><li><a href=\"#capacity-and-working-distance\">How do you turn line capacity into a real separator duty?<\/a><\/li><li><a href=\"#mechanical-interfaces\">Which machine and material-flow interfaces must be fixed?<\/a><\/li><li><a href=\"#plc-signals\">What must the PLC interface list say?<\/a><\/li><li><a href=\"#responsibilities\">Who owns the interfaces between supplier, OEM and operator?<\/a><\/li><li><a href=\"#acceptance-tests\">How should FAT and site acceptance be specified?<\/a><\/li><li><a href=\"#production-documents\">Which documents should be agreed before production release?<\/a><\/li><li><a href=\"#quotation-brief\">What should you send Corvelan to start the quotation?<\/a><\/li><li><a href=\"#faq\">Frequently asked questions<\/a><\/li><\/ul><\/nav>\n<section class=\"cv-section\" id=\"specification-basics\"><h2>What should an OEM specify before asking for a model?<\/h2>\n<p><strong>Start with the result the line needs, then describe the feed and the connections needed to achieve it.<\/strong> \u201cA magnetic separator for a 1,000 mm belt\u201d leaves too much open. Two conveyors with that width can carry very different depths, speeds and metal loads.<\/p>\n<p>Use the following information as the first page of your RFQ, or request for quotation.<\/p>\n<div aria-label=\"What should an OEM specify before asking for a model? \u2014 table\" class=\"cv-table-scroll\" role=\"region\" tabindex=\"0\"><table>\n<thead>\n<tr>\n<th scope=\"col\">What to specify<\/th>\n<th scope=\"col\">What to write<\/th>\n<th scope=\"col\">How it changes the proposal<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Separation task<\/td>\n<td>Protect a crusher, recover a magnetic fraction, or lower contamination in a product<\/td>\n<td>Sets the equipment family and the result to measure<\/td>\n<\/tr>\n<tr>\n<td>Target material<\/td>\n<td>Metal or mineral type; size, shape and mass; expected loading; where it sits in the feed<\/td>\n<td>Defines the capture or separation challenge<\/td>\n<\/tr>\n<tr>\n<td>Feed condition<\/td>\n<td>Material, particle-size range, moisture, bulk density, temperature and flow behavior<\/td>\n<td>Shows whether the feed can reach the magnetic zone consistently<\/td>\n<\/tr>\n<tr>\n<td>Operating range<\/td>\n<td>Normal and peak flow, belt speed or slurry flow, maximum layer depth, surge duration and operating hours<\/td>\n<td>Defines the conditions the machine must handle together<\/td>\n<\/tr>\n<tr>\n<td>Mechanical connections<\/td>\n<td>Feed and outlet dimensions, mounting points, working gap, surrounding steel and service space<\/td>\n<td>Allows the equipment to fit and discharge correctly<\/td>\n<\/tr>\n<tr>\n<td>Power and controls<\/td>\n<td>Available supply, commands, status signals, faults and required line actions<\/td>\n<td>Defines the electrical and PLC scope<\/td>\n<\/tr>\n<tr>\n<td>Acceptance<\/td>\n<td>Test material, setup, measurements, pass criteria, witness and approval responsibility<\/td>\n<td>Gives both parties the same definition of completion<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h3 id=\"specification-basics-1\">Define \u201cgood separation\u201d for the actual job<\/h3>\n<p><strong>Crusher protection, material recovery and product purification need different acceptance measures.<\/strong> For protection, list representative harmful steel pieces and their dimensions, shape and mass. Include the hardest position to reach, such as a target buried near the belt. \u201cRemove all iron\u201d gives neither the supplier nor the test team a usable target.<\/p>\n<p>For recovery, specify how much of the valuable magnetic material should enter the recovered stream and what grade that stream needs. For purification, specify the contamination remaining in the saleable product and the allowed loss of good product into the reject. Increasing collection is a poor trade if it also sends too much valuable material into the wrong outlet.<\/p>\n<p>Keep a field for each unknown input, with a named person and a date to close it. An estimate can support an early budget proposal. Before production release, resolve the inputs that can change the magnetic system, interfaces or acceptance result.<\/p>\n<\/section>\n<section class=\"cv-section\" id=\"capacity-and-working-distance\"><h2>How do you turn line capacity into a real separator duty?<\/h2>\n<p><strong>Specify the operating combinations that create the deepest feed, greatest working distance and shortest exposure time.<\/strong> Average tonnes per hour alone can hide the condition that controls the separator size.<\/p>\n<p>Take flow data from the line mass balance and feeder design. Use the material&#8217;s loose bulk density, including the expected variation, rather than its solid density. Record maximum particle size and moisture separately: a wet, lumpy feed can resist metal extraction even when its average flow looks acceptable. An original <a href=\"https:\/\/gtekmagnet.com\/wp-content\/uploads\/2021\/09\/GTEK-CONVEYOR-BELT-MAGNETS-FORM.pdf\" rel=\"nofollow noopener\" target=\"_blank\">conveyor-magnet questionnaire from GTEK<\/a> requests these material and conveyor inputs together.<\/p>\n<h3 id=\"capacity-and-working-distance-1\">Convert tonnes per hour into the load the conveyor carries<\/h3>\n<p><strong>Use mass flow, bulk density and belt speed to calculate the loaded cross-sectional area.<\/strong> This links the process engineer&#8217;s throughput figure to the mechanical layout.<\/p>\n<p>For steady conveying:<\/p>\n<p><strong>Loaded area A (m\u00b2) = Q \u00f7 (3,600 \u00d7 \u03c1 \u00d7 v)<\/strong><\/p>\n<p>Here, Q is mass flow in t\/h, \u03c1 is loose bulk density in t\/m\u00b3, and v is belt speed in m\/s.<\/p>\n<p>Suppose a new line runs at 80 t\/h with a bulk density of 0.60 t\/m\u00b3 and a belt speed of 1.5 m\/s. A peak condition combines 120 t\/h with a lighter material at 0.40 t\/m\u00b3.<\/p>\n<div aria-label=\"How do you turn line capacity into a real separator duty? \u2014 table\" class=\"cv-table-scroll\" role=\"region\" tabindex=\"0\"><table>\n<thead>\n<tr>\n<th scope=\"col\">Condition<\/th>\n<th scope=\"col\">Volume flow<\/th>\n<th scope=\"col\">Loaded area at 1.5 m\/s<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Normal: 80 t\/h at 0.60 t\/m\u00b3<\/td>\n<td>133.3 m\u00b3\/h<\/td>\n<td>0.0247 m\u00b2<\/td>\n<\/tr>\n<tr>\n<td>Peak: 120 t\/h at 0.40 t\/m\u00b3<\/td>\n<td>300.0 m\u00b3\/h<\/td>\n<td>0.0556 m\u00b2<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>The peak mass flow is 50% higher, but the loaded area is <strong>2.25 times larger<\/strong>. Size the feed arrangement around the peak combination if the line must process it without reducing output. If that combination cannot occur, list the real combinations instead of combining unrelated maxima.<\/p>\n<p>For a flat, uniformly loaded strip, dividing area by effective loaded width gives average depth. A troughed belt has a different profile. Use its actual cross-section, surcharge profile and expected surges to obtain the maximum depth beneath the magnet. Do not substitute average depth for the deepest target position.<\/p>\n<h3 id=\"capacity-and-working-distance-2\">Give the working distance a clear measurement reference<\/h3>\n<p><strong>State both the magnet-face-to-belt distance and the maximum material depth, using dimensions on the same drawing.<\/strong> \u201cSuspension height\u201d can be misunderstood if one person measures from the steel frame and another measures from the active magnetic face.<\/p>\n<p>For a separate layout example, suppose the magnetic face sits 130 mm above the top of a 140 mm burden. A small target near the belt is then approximately <strong>130 + 140 = 270 mm from that face<\/strong>. If the layout raises the magnet by 50 mm, the distance becomes 320 mm. The original selection must be reviewed at 320 mm even though the conveyor width has not changed.<\/p>\n<p>For self-cleaning equipment, also dimension the lowest moving belt or cover and the clearance it needs above the material. Show any barrier between the magnetic face and the target. When the face-to-belt dimension already includes those layers, do not add them again.<\/p>\n<p>The installation sections of <a href=\"https:\/\/www.eriez.com\/Documents\/Literature\/IOMs\/Magnetic-Separation\/SM-323-Eriez-Suspend-Electromagnet-IOM.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Eriez&#8217;s suspended-electromagnet manual<\/a> illustrate why the reference face, material clearance and nearby conveyor parts matter. Use the selected separator&#8217;s agreed geometry for the actual order. If headroom forces a larger gap, compare a different mounting point or controlled feed presentation before simply requesting a higher surface Gauss value.<\/p>\n<\/section>\n<section class=\"cv-section\" id=\"mechanical-interfaces\"><h2>Which machine and material-flow interfaces must be fixed?<\/h2>\n<figure class=\"cv-media\"><img loading=\"lazy\" src=\"https:\/\/www.corvelanmag.com\/wp-content\/uploads\/2026\/09\/dry-drum-magnetic-separator-complete-unit-real.webp\" alt=\"Magnetic drum assembly with feed hopper and supporting structure\" width=\"800\" height=\"600\" loading=\"lazy\" decoding=\"async\" style=\"display:block;max-width:100%;height:auto;object-fit:contain;\"><\/figure>\n<p><strong>Draw the incoming material, each outgoing stream and the space needed to service the separator.<\/strong> Overall machine dimensions alone do not show whether the new line can feed, clean or empty it.<\/p>\n<div aria-label=\"Which machine and material-flow interfaces must be fixed? \u2014 table\" class=\"cv-table-scroll\" role=\"region\" tabindex=\"0\"><table>\n<thead>\n<tr>\n<th scope=\"col\">Arrangement<\/th>\n<th scope=\"col\">Interfaces to include in the specification<\/th>\n<th scope=\"col\">Problem this prevents<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Suspended or overband magnet<\/td>\n<td>Conveyor profile, mounting direction, face-to-belt distance, adjustment range, support points and iron discharge zone<\/td>\n<td>A magnet that fits above the belt but cannot lift or discharge the target reliably<\/td>\n<\/tr>\n<tr>\n<td>Dry magnetic drum<\/td>\n<td>Feeder outlet, feed width and distribution, drop height, drum rotation, splitter adjustment and two discharge connections<\/td>\n<td>Uneven loading, impact damage or separated streams mixing again<\/td>\n<\/tr>\n<tr>\n<td>Cyclic dry-powder filter<\/td>\n<td>Feed isolation, cleaning outlet, product outlet, upstream storage and plant-control handshake<\/td>\n<td>Product entering during cleaning or an upstream feeder continuing into a blocked path<\/td>\n<\/tr>\n<tr>\n<td>Wet separator<\/td>\n<td>Total slurry flow, dry-solids rate, solids concentration and its basis, feed distribution, outlets and water services where required<\/td>\n<td>Selecting from dry tonnes alone while the hydraulic flow exceeds the proposed arrangement<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>For conveyor protection, our <a href=\"https:\/\/www.corvelanmag.com\/products\/overband-magnetic-separator\/\">overband magnetic separator<\/a> is a relevant starting point when the task is to lift suitable ferrous metal from a moving burden. Define where the iron lands. The collection bin and chute must keep it out of the clean stream and away from access routes. Show the largest target&#8217;s clearance through the discharge path, not just the clearance needed for small test pieces.<\/p>\n<p>For controlled dry-feed separation, a <a href=\"https:\/\/www.corvelanmag.com\/products\/dry-drum-magnetic-separator\/\">dry drum magnetic separator<\/a> needs an agreed feed arrangement and two usable outlets. An OEM-supplied feeder is part of the separation system: a narrow heap at the drum center can defeat a specification based on even feed across the full working width.<\/p>\n<h3 id=\"mechanical-interfaces-1\">Include the space and conditions needed after installation<\/h3>\n<p><strong>Reserve access for cleaning, adjustment and removal of the parts that wear.<\/strong> A door opening on a GA drawing is insufficient if a platform rail blocks the door or there is no route to remove a belt, drum or matrix.<\/p>\n<p>Ask for equipment mass, support reactions and relevant operating loads for the support designer. Identify which party provides the frame, suspension hardware, access platform and lifting arrangement. Show nearby steelwork and conveyor components for the separator supplier&#8217;s review; avoid assuming that a magnet can be placed beside any steel structure without affecting the installation.<\/p>\n<p>List ambient and material temperatures separately, plus abrasion, corrosion, washdown and dust conditions that affect construction. If the process has combustible dust or a hazardous-area classification, obtain the site&#8217;s classification and required equipment protection before selecting electrical equipment. For food-contact service, state the contact materials, cleanability and product-change requirements. These conditions belong in the RFQ; they cannot be inferred from \u201cstainless steel\u201d or \u201cindustrial duty.\u201d<\/p>\n<\/section>\n<section class=\"cv-section\" id=\"plc-signals\"><h2>What must the PLC interface list say?<\/h2>\n<p><strong>Every command and status signal needs a defined meaning, electrical form, failure state and resulting line action.<\/strong> A signal called \u201cseparator running\u201d is too vague when the magnetic field, cleaning belt and feeder can be in different states.<\/p>\n<p>Build an I\/O list, meaning the inputs and outputs exchanged between the separator and the line PLC. For each signal, record its direction, terminal or network address, voltage and contact or data type, normal state, power-loss state, timing, alarm text and reset owner. If communications are requested, specify the protocol and the action on a lost connection.<\/p>\n<p>The following are <strong>functions to specify for the selected design<\/strong>. They are not a list of sensors supplied as standard.<\/p>\n<div aria-label=\"What must the PLC interface list say? \u2014 table\" class=\"cv-table-scroll\" role=\"region\" tabindex=\"0\"><table>\n<thead>\n<tr>\n<th scope=\"col\">Function<\/th>\n<th scope=\"col\">What it should mean<\/th>\n<th scope=\"col\">Action to define<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Remote start or stop command<\/td>\n<td>The plant requests an allowed operating state<\/td>\n<td>Local\/remote priority, start conditions and stop sequence<\/td>\n<\/tr>\n<tr>\n<td>Available for feed<\/td>\n<td>The required operating conditions are present<\/td>\n<td>Which conditions permit the upstream feeder to start<\/td>\n<\/tr>\n<tr>\n<td>Cleaning-belt or drum status<\/td>\n<td>Motor command, drive feedback or measured motion, identified separately<\/td>\n<td>What happens if commanded movement is not achieved<\/td>\n<\/tr>\n<tr>\n<td>Electromagnet supply status<\/td>\n<td>Defined supply or excitation condition<\/td>\n<td>Alarm, feed inhibition and controlled shutdown on loss<\/td>\n<\/tr>\n<tr>\n<td>Temperature or cooling fault<\/td>\n<td>The specified protection device has detected its defined fault<\/td>\n<td>Which loads stop, what remains active and how restart is allowed<\/td>\n<\/tr>\n<tr>\n<td>Cleaning active or feed inhibit<\/td>\n<td>The separator is unavailable for normal product feed<\/td>\n<td>Upstream stop, buffering and return-to-feed handshake<\/td>\n<\/tr>\n<tr>\n<td>Detector metal event<\/td>\n<td>A target has triggered the detector<\/td>\n<td>Alarm, stop, marking or rejection, with event reset rules<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h3 id=\"plc-signals-1\">Separate magnet condition from belt motion<\/h3>\n<p><strong>An energized coil does not establish that the cleaning belt is moving, and a motor run command does not establish belt travel.<\/strong> If loss of movement matters, specify how it will be detected. Drive feedback and an independent motion sensor answer different questions.<\/p>\n<p>For a permanent magnet, there is no electrical \u201cfield on\u201d command. The cleaning-belt drive can stop while the magnetic field remains present. For an electromagnet, field supply, cooling and discharge-belt operation need separate definitions. Write the response to each fault with the separator supplier, including the upstream feed response and handling of retained metal. Avoid a blanket instruction to switch every load off together: the required cooling and shutdown sequence depends on the selected design.<\/p>\n<p>Ordinary operating signals serve process control. If a function protects people, specify its required safety performance and have the machine safety design cover the complete function. A standard alarm relay should not silently become the line&#8217;s personnel safety circuit.<\/p>\n<h3 id=\"plc-signals-2\">Plan the NLD cleaning handshake before promising continuous output<\/h3>\n<p><strong>For a cyclic powder filter, the line must stop feeding that unit during its defined cleaning stage or provide another validated material path.<\/strong> Corvelan&#8217;s <a href=\"https:\/\/www.corvelanmag.com\/products\/high-intensity-magnetic-filter\/\">NLD high-intensity magnetic filter<\/a> uses a PLC-controlled feeding and cleaning sequence. Its public information calls for the plant&#8217;s run, stop, alarm, cleaning and protection signals to be defined.<\/p>\n<p>Write the intended handshake in plain language before assigning addresses:<\/p>\n<ol>\n<li>The separator withdraws permission to feed or requests cleaning.<\/li>\n<li>The upstream system stops the feed and returns the required stopped or isolated status.<\/li>\n<li>The separator completes the agreed residual-material and outlet-valve sequence before cleaning and iron discharge.<\/li>\n<li>After cleaning, the required operating state and outlet positions are restored.<\/li>\n<li>The separator returns feed permission; the plant restarts through its defined sequence.<\/li>\n<\/ol>\n<p>Tie timers, valve feedback and fault handling to the supplied design. If the upstream process cannot pause, calculate the storage needed over the unavailable interval. Also allow enough running capacity to empty that storage between cleaning cycles. A buffer delays overflow; it does not create missing average capacity. Parallel units are another candidate when their combined operating and cleaning schedule can maintain the required output.<\/p>\n<p>For example, a steady 2 t\/h feed produces <strong>2 \u00d7 90 \u00f7 3,600 = 0.05 t, or 50 kg<\/strong>, during a 90-second unavailable interval. Suppose the filter then feeds for 15 minutes before the next 90-second interruption. Over that 16.5-minute cycle, 0.55 t arrives. The required feed-stage rate is therefore <strong>0.55 \u00f7 0.25 = 2.2 t\/h<\/strong> just to keep pace. Select usable storage and operating capacity with allowance for the actual feed variation, retained material and cycle timing.<\/p>\n<h3 id=\"plc-signals-3\">Connect metal detection to the actual stopping distance<\/h3>\n<p><strong>Place the detector far enough upstream for the entire stop or reject action to finish.<\/strong> A <a href=\"https:\/\/www.corvelanmag.com\/product-category\/conveyor-metal-detector\/\">conveyor metal detector<\/a> detects metal; the connected line performs the chosen action.<\/p>\n<p>For a stop arrangement, assess travel during the detector, relay and PLC delay, then add measured travel while the loaded belt stops. Suppose belt speed is 1.5 m\/s, the total delay is 0.20 s, and travel after the stop command is 2.4 m. The target travels <strong>1.5 \u00d7 0.20 + 2.4 = 2.7 m<\/strong> before stopping. The layout needs additional project-defined allowance for variation and target location.<\/p>\n<p>Measure the loaded stopping travel under the conditions used for the design; do not infer it from an unloaded motor test. Record how the operator will find and remove the metal after isolation, and who authorizes restart. Include nearby magnet interference and the detector&#8217;s required installation clearances in the layout review.<\/p>\n<\/section>\n<section class=\"cv-section\" id=\"responsibilities\"><h2>Who owns the interfaces between supplier, OEM and operator?<\/h2>\n<p><strong>Assign responsibility at each physical connection and control function, then name the person who accepts the integrated result.<\/strong> \u201cBy others\u201d is not enough unless the responsible party and its deliverable are identified.<\/p>\n<p>Use a responsibility table in the RFQ and resolve it with the quotation. A practical starting allocation is below; the agreed contract may assign the work differently.<\/p>\n<div aria-label=\"Who owns the interfaces between supplier, OEM and operator? \u2014 table\" class=\"cv-table-scroll\" role=\"region\" tabindex=\"0\"><table>\n<thead>\n<tr>\n<th scope=\"col\">Work item<\/th>\n<th scope=\"col\">Separator supplier<\/th>\n<th scope=\"col\">Line OEM or integrator<\/th>\n<th scope=\"col\">Plant owner or operator<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Process basis<\/td>\n<td>Identify missing selection inputs and propose a suitable arrangement<\/td>\n<td>Compile the line duty and feed combinations<\/td>\n<td>Provide expected materials, targets and operating needs<\/td>\n<\/tr>\n<tr>\n<td>Mechanical connections<\/td>\n<td>Supply agreed machine dimensions, loads and service requirements<\/td>\n<td>Design the connecting equipment, supports and access within its scope<\/td>\n<td>Provide site restrictions and approve operating access<\/td>\n<\/tr>\n<tr>\n<td>Controls<\/td>\n<td>Define the supplied cabinet, devices, terminals and machine sequence<\/td>\n<td>Implement line logic, upstream\/downstream actions and interface tests<\/td>\n<td>Agree alarm handling, restart permissions and operating practices<\/td>\n<\/tr>\n<tr>\n<td>Acceptance<\/td>\n<td>Perform agreed factory inspections and tests<\/td>\n<td>Coordinate integrated site tests and close interface issues<\/td>\n<td>Supply agreed test material and accept the defined operating result<\/td>\n<\/tr>\n<tr>\n<td>Handover<\/td>\n<td>Provide the documents and parts information included in the order<\/td>\n<td>Combine machine information into the line documentation<\/td>\n<td>Receive operating information and maintain the accepted setup<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>Set a boundary for guarding, electrical isolation, reject collection and dust containment. The supplier may provide guards on its own machine while the OEM must guard a new access point created by the connecting chute. Name both tasks so that the connection is covered.<\/p>\n<p>For UK projects, <a href=\"https:\/\/www.hse.gov.uk\/work-equipment-machinery\/manufacturer-in-situ.htm\" rel=\"nofollow noopener\" target=\"_blank\">HSE&#8217;s guidance on assemblies of machines<\/a> explains that linked machines performing a common function under common control can form an assembly. The party constituting that assembly has responsibilities for its safety, including interface hazards. Use the project&#8217;s actual assembly and destination requirements when assigning conformity work, rather than assuming individual machine documents complete the whole-line assessment.<\/p>\n<\/section>\n<section class=\"cv-section\" id=\"acceptance-tests\"><h2>How should FAT and site acceptance be specified?<\/h2>\n<p><strong>Define factory checks and installed-line performance tests separately, with a method and acceptance criterion for each.<\/strong> FAT means Factory Acceptance Test. SAT means Site Acceptance Test. Passing a dimensional check at the factory answers a different question from removing the agreed metal on the loaded production conveyor.<\/p>\n<div aria-label=\"How should FAT and site acceptance be specified? \u2014 table\" class=\"cv-table-scroll\" role=\"region\" tabindex=\"0\"><table>\n<thead>\n<tr>\n<th scope=\"col\">Test level<\/th>\n<th scope=\"col\">What to test<\/th>\n<th scope=\"col\">Record needed for acceptance<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Build and fit<\/td>\n<td>Dimensions, interfaces, rotation, adjustments and supplied parts<\/td>\n<td>Approved drawing revision and inspection results<\/td>\n<\/tr>\n<tr>\n<td>Electrical and functional<\/td>\n<td>Commands, actual feedback, alarms, power loss and permitted restart<\/td>\n<td>Terminal\/I\/O list and observed cause-and-effect results<\/td>\n<\/tr>\n<tr>\n<td>Separation performance<\/td>\n<td>Representative feed and targets under agreed operating combinations<\/td>\n<td>Feed conditions, settings, sample IDs and measured outputs<\/td>\n<\/tr>\n<tr>\n<td>Integrated line<\/td>\n<td>Feeder response, cleaning handshake, reject handling and detector stop or reject action<\/td>\n<td>Results from the installed system and named acceptance authority<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>Specify test duration or number of passes, sample preparation, target positions, instruments, measurement locations and who supplies the material. Agree the pass criteria before the test. For variable feed, include the difficult credible combinations, rather than testing peak speed and maximum burden only in separate easy trials.<\/p>\n<h3 id=\"acceptance-tests-1\">Match the measurement to the separation goal<\/h3>\n<p><strong>Use captured targets for protection, recovered target mass and grade for recovery, and residual contamination plus product loss for purification.<\/strong> A surface magnetic reading can serve an agreed machine check, but it does not replace those process measurements.<\/p>\n<p>For tramp-metal protection, record target material, shape, dimensions, mass, orientation and location in the burden. Count introduced, captured and remaining targets. Plan controlled trials so that a missed target is recovered before it can reach vulnerable equipment; isolate equipment before manual access.<\/p>\n<p>For mineral or material recovery, weigh the feed and both output streams on the same moisture basis. Use representative samples and assays where the target fraction cannot be identified by weighing alone.<\/p>\n<p>Suppose an agreed dry test uses 100 kg of feed containing 4 kg of the target mineral. The magnetic product weighs 5 kg and analysis shows 72% target mineral:<\/p>\n<ul>\n<li>Target mineral recovered = 5 \u00d7 0.72 = <strong>3.6 kg<\/strong>.<\/li>\n<li>Target recovery = 3.6 \u00f7 4 \u00d7 100 = <strong>90%<\/strong>.<\/li>\n<li>Magnetic product grade = <strong>72%<\/strong>.<\/li>\n<li>Other material carried into that product = 5 \u2212 3.6 = <strong>1.4 kg<\/strong>.<\/li>\n<\/ul>\n<p>Recovery and grade describe different results. If the job is instead to reject that magnetic fraction while retaining the other material, the 1.4 kg becomes a product-loss concern: <strong>1.4 \u00f7 96 \u00d7 100 \u2248 1.46%<\/strong> of the original non-target material. Use the commercial goal to decide which result needs improving. A tighter splitter setting that raises grade may sacrifice recovery, so compare both outputs after adjustment.<\/p>\n<p>Reconcile the combined output mass with the input mass. Investigate retained material, dust, moisture differences and weighing errors before using the percentages to accept a machine. Set the permitted mass-balance difference in the test plan using the measurement method and sampling conditions.<\/p>\n<h3 id=\"acceptance-tests-2\">Write down what happens when a test fails<\/h3>\n<p><strong>Use the failure pattern to choose the next investigation, then repeat the affected test after correction.<\/strong> If capture fails only at peak feed, inspect layer depth, feed distribution and target distance before changing the magnetic system. If a detector alarms with no product passing, investigate installation interference and moving metal before treating the product as the cause. If a cleaning command occurs but the feeder continues, trace the signal and actual feeder response through the interface list.<\/p>\n<p>The <a href=\"https:\/\/nucleus.iaea.org\/sites\/connect\/MSNpublic\/Pages\/nct\/downloads\/Pub1725_web.pdf\" rel=\"nofollow noopener\" target=\"_blank\">IAEA procurement-engineering guide, Appendix VII<\/a> provides a useful specification-writing example: identify interfaces, test requirements, acceptance criteria and documentation. Its context is nuclear facilities. Here, the useful practice is to make those requirements explicit in the separator order; the project defines the applicable equipment requirements and tests.<\/p>\n<\/section>\n<section class=\"cv-section\" id=\"production-documents\"><h2>Which documents should be agreed before production release?<\/h2>\n<p><strong>Release production against a coordinated specification, drawing and test package with clear revisions.<\/strong> The same working gap, feed range and control actions should appear wherever they affect the order.<\/p>\n<p>Include these items where they apply:<\/p>\n<ul>\n<li><strong>Process specification:<\/strong> material, target, normal and peak operating combinations, and required result.<\/li>\n<li><strong>Approved GA drawing:<\/strong> installation dimensions, measurement references, connections, support loads, flow directions, discharge and service access.<\/li>\n<li><strong>Electrical and control documents:<\/strong> supply requirements, load list, terminals, I\/O list and the action caused by each command or fault.<\/li>\n<li><strong>Supply-scope list:<\/strong> machine, drive, cabinet, sensors, supports, chutes, guards, cables, spares and installation work, each marked with its supplier.<\/li>\n<li><strong>Inspection and acceptance plan:<\/strong> methods, criteria, records, witness points and approval responsibility.<\/li>\n<li><strong>Handover list:<\/strong> operating instructions, as-built drawings, spare-part identification and agreed inspection or test records.<\/li>\n<\/ul>\n<p>Ask the supplier to respond to each requirement as included, excluded, proposed alternative or open. Compare quotations only after resolving differences that affect the result or installation. A lower price with no feeder, reject chute or required controls can represent a different scope.<\/p>\n<h3 id=\"production-documents-1\">Use requirement wording that can be answered and tested<\/h3>\n<p><strong>Write the condition and expected action in the same requirement.<\/strong> Replace broad phrases with entries such as these:<\/p>\n<div aria-label=\"Which documents should be agreed before production release? \u2014 table\" class=\"cv-table-scroll\" role=\"region\" tabindex=\"0\"><table>\n<thead>\n<tr>\n<th scope=\"col\">Broad wording<\/th>\n<th scope=\"col\">More useful specification wording<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u201cSuitable for 120 t\/h\u201d<\/td>\n<td>\u201cProcess 120 t\/h at the stated low-density feed condition and belt speed, with the maximum burden profile shown on drawing L-01.\u201d<\/td>\n<\/tr>\n<tr>\n<td>\u201cPLC compatible\u201d<\/td>\n<td>\u201cProvide an agreed I\/O schedule identifying feed permission, drive feedback, cleaning status, faults, electrical form and loss-of-power states.\u201d<\/td>\n<\/tr>\n<tr>\n<td>\u201cAutomatic cleaning\u201d<\/td>\n<td>\u201cDefine when feed is inhibited, how feed stoppage is established, where captured material discharges and what allows feed to resume.\u201d<\/td>\n<\/tr>\n<tr>\n<td>\u201cHigh magnetic strength\u201d<\/td>\n<td>\u201cDemonstrate the agreed target-removal result at the stated target positions, working distance and feed conditions; record any specified magnetic readings using the agreed method.\u201d<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>When an input changes, identify the affected requirements before approving the revision. A raised mounting point affects capture distance; a changed chute can alter feed distribution; a new drive can alter stopping travel. Update the related drawing, control logic and acceptance condition together. Close important open items before fabrication makes them costly to change.<\/p>\n<\/section>\n<section class=\"cv-section\" id=\"quotation-brief\"><h2>What should you send Corvelan to start the quotation?<\/h2>\n<p><strong>Send the material and target, normal and peak operating conditions, and a layout showing the proposed installation and discharge paths.<\/strong> Add the control actions and acceptance result that the line must achieve. If a value is still an estimate, identify it and explain when the final value will be available.<\/p>\n<p>A workable OEM magnetic separator specification connects the required result to the feed, geometry, signals and test method. Once these agree, model selection and quotation become much clearer, and the OEM can coordinate the separator with the rest of the line.<\/p>\n<p>Use our <a href=\"https:\/\/www.corvelanmag.com\/contact-us\/\">contact page to send your processing-line requirements<\/a>. Include the project reference and the information above in the message. Send drawings and the specification file to <a href=\"mailto:sales@corvelanmag.com\">sales@corvelanmag.com<\/a>. We review the material and line information to identify missing selection details and define the equipment and quotation scope.<\/p>\n<\/section>\n<section class=\"cv-section cv-faq\" id=\"faq\"><h2>Frequently asked questions<\/h2>\n<h3 id=\"faq-1\">Can an OEM request a quotation before the final raw material is available?<\/h3>\n<p><strong>Yes, an OEM can request a budget proposal using the expected material range and clearly identified estimates.<\/strong> Separate that proposal from production release. Before freezing performance requirements, obtain representative material data or a suitable sample where magnetic response, moisture or flow behavior could change the selection. Assign each open item an owner so it is resolved before the affected design is released.<\/p>\n<h3 id=\"faq-2\">Does a permanent magnetic separator need no electrical connection?<\/h3>\n<p><strong>The permanent magnetic field needs no electrical supply, but the complete machine may still need power.<\/strong> A self-cleaning belt, rotating drum, sensors or control cabinet can add electrical loads. List field generation and driven equipment separately in the load schedule, and include the isolation arrangements needed for service.<\/p>\n<h3 id=\"faq-3\">Can a single cyclic powder filter serve a continuously feeding line?<\/h3>\n<p><strong>Yes, if the system can hold incoming material while that filter cleans and then clear the stored material during normal operation.<\/strong> Size storage from incoming flow and the full unavailable interval. Check average capacity across repeated cycles as well as peak running capacity. If the backlog grows each cycle, add capacity, change the operating schedule or assess a parallel arrangement.<\/p>\n<h3 id=\"faq-4\">Does a PLC-controlled separator automatically support Modbus or PROFINET?<\/h3>\n<p><strong>No, PLC control does not establish a plant-network connection or a specific communication protocol.<\/strong> Specify the protocol, available hardware, exchanged data, update needs and communication-loss action. If the supplied interface uses discrete contacts, define their electrical ratings and states instead. Put the agreed interface in the quotation and electrical documents.<\/p>\n<h3 id=\"faq-5\">What if the factory cannot test the separator with production material?<\/h3>\n<p><strong>Separate the checks that can be completed at the factory from material-performance acceptance at the site.<\/strong> Complete agreed dimensional, build and functional checks, then list the remaining material trial, its conditions and acceptance criteria. Define who supplies the sample, where the trial occurs and which approval depends on it. Keep the uncompleted performance test visible in the acceptance plan.<\/p>\n<h3 id=\"faq-6\">Who signs off when the feeder, separator and controls come from different suppliers?<\/h3>\n<p><strong>Name one coordinator for the integrated acceptance plan and identify the approver for each result.<\/strong> Each supplier closes its assigned machine and interface items; the party responsible for the line coordinates the combined tests with the operator. Agree who accepts separation performance, control actions and site completion before placing the orders.<\/p>\n<h3 id=\"faq-7\">How should the specification handle stainless steel or non-ferrous contamination?<\/h3>\n<p><strong>List those targets separately from carbon steel, including alloy or material identity, size, shape and condition.<\/strong> Stainless steel can have very different magnetic responses depending on grade and processing. Aluminum and copper require a suitable detection or separation method rather than ordinary magnetic attraction. Where metal detection is proposed, define the required target and prove detection plus the line response under the actual installation conditions.<\/p><\/section>\n<\/div>\n<script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Can an OEM request a quotation before the final raw material is available?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Yes, an OEM can request a budget proposal using the expected material range and clearly identified estimates. Separate that proposal from production release. Before freezing performance requirements, obtain representative material data or a suitable sample where magnetic response, moisture or flow behavior could change the selection. Assign each open item an owner so it is resolved before the affected design is released.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Does a permanent magnetic separator need no electrical connection?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"The permanent magnetic field needs no electrical supply, but the complete machine may still need power. A self-cleaning belt, rotating drum, sensors or control cabinet can add electrical loads. List field generation and driven equipment separately in the load schedule, and include the isolation arrangements needed for service.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Can a single cyclic powder filter serve a continuously feeding line?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Yes, if the system can hold incoming material while that filter cleans and then clear the stored material during normal operation. Size storage from incoming flow and the full unavailable interval. Check average capacity across repeated cycles as well as peak running capacity. If the backlog grows each cycle, add capacity, change the operating schedule or assess a parallel arrangement.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Does a PLC-controlled separator automatically support Modbus or PROFINET?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"No, PLC control does not establish a plant-network connection or a specific communication protocol. Specify the protocol, available hardware, exchanged data, update needs and communication-loss action. If the supplied interface uses discrete contacts, define their electrical ratings and states instead. Put the agreed interface in the quotation and electrical documents.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What if the factory cannot test the separator with production material?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Separate the checks that can be completed at the factory from material-performance acceptance at the site. Complete agreed dimensional, build and functional checks, then list the remaining material trial, its conditions and acceptance criteria. Define who supplies the sample, where the trial occurs and which approval depends on it. Keep the uncompleted performance test visible in the acceptance plan.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Who signs off when the feeder, separator and controls come from different suppliers?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Name one coordinator for the integrated acceptance plan and identify the approver for each result. Each supplier closes its assigned machine and interface items; the party responsible for the line coordinates the combined tests with the operator. Agree who accepts separation performance, control actions and site completion before placing the orders.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How should the specification handle stainless steel or non-ferrous contamination?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"List those targets separately from carbon steel, including alloy or material identity, size, shape and condition. Stainless steel can have very different magnetic responses depending on grade and processing. Aluminum and copper require a suitable detection or separation method rather than ordinary magnetic attraction. Where metal detection is proposed, define the required target and prove detection plus the line response under the actual installation conditions.\"\n      }\n    }\n  ]\n}\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>An OEM magnetic separator specification should define the required separation result, the material entering the machine, its operating range, the physical and control connections, and the acceptance tests. Write these requirements before choosing a model. A supplier can then size the separator for the same conditions that the new processing line must handle. For a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4511,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/posts\/5562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/comments?post=5562"}],"version-history":[{"count":1,"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/posts\/5562\/revisions"}],"predecessor-version":[{"id":5617,"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/posts\/5562\/revisions\/5617"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/media\/4511"}],"wp:attachment":[{"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/media?parent=5562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/categories?post=5562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.corvelanmag.com\/de\/wp-json\/wp\/v2\/tags?post=5562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}